Panel Load CheckEV charger & heat pump pre-check

Plan before you install

100A Electrical Panel Load Calculator

Estimate whether your panel has capacity for an EV charger or electric heat pump using the NEC 220.82 optional method.

Your home & planned loads

Adjust the starting values to match your home.

Fixed appliances

Select appliances in the home. Values can be adjusted under Advanced.

Advanced: edit appliance VA

Estimated panel load

Calculated demand compared with panel rating

SAFE
—A of 100A

Likely Has Headroom

0APanel limit 100A

0% of panel rating

Load breakdown

General + fixed demand
— VA
Largest HVAC load
— VA
EV charger
— VA
Total calculated load
— VA

Common questions

EV charger & panel load FAQs

Can a 100-amp panel handle a Level 2 EV charger?

Yes, in many homes. Setting charging current to 16A–32A or using NEC-compliant EV load management can make room without upgrading to 200A; an electrician must verify the service calculation and equipment compatibility.

How does the NEC 220.82 optional load calculation work?

It starts with 3 VA per square foot plus 4,500 VA, then adds selected fixed appliances. The first 10,000 VA counts at 100% and the remainder at 40%, followed by the largest HVAC load and EV charger at 100%.

Do I have to upgrade to a 200A panel if my calculation is over 100A?

No. NEC 750.30 and 625.42 provide for properly applied energy-management options, which may include dynamic load-balancing chargers, compatible dryer splitters such as NeoCharge, or load-shedding boxes such as DCC-12. An electrician and local AHJ must confirm equipment listing, installation, and acceptance.

Is a 16A or 24A EV charger fast enough for daily driving?

A 16A charger adds about 12 miles of range per charging hour, while 24A adds about 18 miles per hour. Over an 8–10-hour overnight charge, that is roughly 96–180 miles—enough for many US commuters, depending on the vehicle and conditions.

Does this calculator replace a licensed electrician's load calculation?

No. This is an educational pre-check, not a permit calculation or substitute for a complete load calculation by a licensed electrician. Local AHJ requirements and utility rules vary.

This estimate is not a permit calculation or a substitute for a complete load calculation.